Access
This article is part of Nature's premium content.
Published online 17 October 2008 | 455, 1015 (2008) | doi:10.1038/4551015a
News
Eight-month delay for LHC
Broken magnets put particle collider in limbo.
Details of last month's accident at the Large Hadron Collider (LHC), the world's premier particle accelerator, are emerging — and confirm that the machine will not restart before late May or early June 2009.
Officials at CERN, Europe's particle-physics laboratory near Geneva, Switzerland, say that the time is needed to overhaul a sector of the 27-kilometre-long machine, after an electrical failure on 19 September caused some 6 tonnes of ultra-cold liquid helium to leak into its tunnel.
To read this story in full you will need to login or make a payment (see right).
Comments
Reader comments are usually moderated after posting. If you find something offensive or inappropriate, you can speed this process by clicking 'Report this comment' (or, if that doesn't work for you, email redesign@nature.com). For more controversial topics, we reserve the right to moderate before comments are published.
"Not including labour and the spares, the work will cost an estimated 100,000 Swiss francs (US$90,000)." So what is there besides labour and materials; shipping and handling? Thanks for the link to the preliminary accident report.
This comment has been removed by the moderator